Start-up and operation
5.4 Change of material
The entire system has to be flushed thoroughly to avoid any possible che-
mical reaction with the new coatings material.
1. Shutting down
Follow all the instructions found in chap. 5.5 Shutting down on page 29.
2. Shutting down the equipment
After disconnecting the heater from the electrical power supply, perform
all steps covering changing materials and/or shutting down as found in the
Operation manual for the spray pump/system.
3. Flush
Flush the complete system:
when the unit is cold
disconnected from the electrical power supply
Use the solvent that is recommended by the coatings manufacturer.
Follow the instructions found in the operation manual of your spraying
equipment covering changing materials and/or starting up the unit.
4. Restarting the unit
Follow the instructions found in the Operation manual for the spraying
equipment being used.
Complete the instructions found in see chap. „5 Start-up and operation“,
P. 27, Step 4-6.
5.5 Shutting down
1. Turn off the Fluid Heater
Turn off the Fluid Heater 10 minutes before
work is completed.
To do this, turn the temperature knob to the
position „I“ Pic. 6.1.
This will enable the operator to use the residual
heat up until the end of work while shortening
the cooling time until the unit can be flushed.
Pic. 6.1
2. Disconnect from electrical power supply
Disconnect the heater from the electrical power supply.
3. Flush
Avoid damage to the unit and the entire system by thoroughly flushing after
every shutdown.